Creating activities

Creating an activity in the Gantt chart allows you to structure the schedule over time and organise project tasks.

An activity can represent, for example:

The Gantt chart therefore becomes an essential entry point for building the temporal logic of the project.


Accessing activity creation

From the Gantt design view, it is possible to add an activity directly within the schedule table.

Creation is done from the Gantt interface, accessible from the navigation sidebar.

Once in this view, the user can select the level of the project where the activity should be created.


Choosing the creation level

Before adding an activity, it is necessary to define where it will be inserted within the project structure.

An activity can be created within:

This choice helps organise the schedule consistently and maintain a clear structure.


Adding an activity

An activity can be created in several ways within the Gantt chart.

1. Add an activity at the same level

The “+“ button allows you to add an activity at the same hierarchical level as the currently selected activity.

2. Add a nested activity

The nested ”+“ button allows you to add an activity inside the selected level, like a sub-activity.

3. Create an activity directly in the Gantt chart

It is also possible to create an activity directly in the diagram:

  1. right-click in the Gantt chart
  2. select Add activity
  3. draw the activity with the mouse at the desired location

This method allows you to position the activity directly in time when creating it.

Once created, the activity appears in the schedule structure.


Main activity parameters

Once created, the activity can be completed or modified from the Gantt table or from its properties.

The main parameters of an activity generally include:

These elements define precisely the position of the activity within the schedule.


Editing an activity

An existing activity can be modified directly in the Gantt chart.

Depending on the situation, editing can be done:


Using activities within the scheduling logic

Activity creation is the foundation of building the Gantt chart.

Once activities are created, it becomes possible to:

The Gantt chart then becomes a true tool for building, reviewing and analysing the project schedule.