====== Activity management ====== Activities represent the **operations carried out within the project**. They can be associated with **zones** or **axes** in order to represent their location and progression within the phasing. ----- ===== Adding activities ===== ==== Simple activity creation from a zone ==== To create an activity from a zone: - click on the **zone label** - the zone editing window appears - click **Properties**, then **Add** - an activity editing window opens where the activity can be configured {{:en:phasing:2026-03-13_09h48_54.png?300|}} The activity is then **linked to the selected zone**. It is also possible to add an existing activity to the zone using the following drop-down menu: {{:en:phasing:2026-03-13_09h50_04.png?300|}} ----- ===== Creating summary activities ===== Summary activities allow you to **group several activities** within the same phase. To create an activity: - select the **sub-project** in the left panel of the Gantt - select an existing activity - click the **Add** button A new activity appears in the Gantt. Its information can then be modified: * directly in the columns * via the **Edit** menu accessible with a **right-click** For example: * **Name**: Phase 1: North roundabout (1/2) * **ID**: 1 An activity becomes a **summary activity** when it has at least **one child activity**. To do this, simply **drag an activity beneath it** in the Gantt. ----- ===== Other ways to associate an activity with a zone or an axis ===== - From the Gantt located below the plan workspace, an activity can be dragged directly onto a **zone or axis** to associate it. - This association can also be done from the **activity editing window** by opening the **ZONE** tab. {{:en:phasing:2026-03-13_09h53_01.png?600|}}